"How to" is done as an alpha version, will be shown in the near future at a website of your trust![]()
"How to" is done as an alpha version, will be shown in the near future at a website of your trust![]()
Project is planned, outlined, sketch is done, just a few bits of material are missing (but will have them at the WE), source material is available.Originally Posted by DA_Demorney
Work will start as soon as I have the time for it![]()
Ok, IOriginally Posted by DA_Demorney
Well, my third terrain project of course!
I want to work more with elevations and go into 3D. And I will develop a DA region that has been hinted at but never been shown before in this detail![]()
I know, I'm teasing too much. sigh. But I can' but I can't be more specific about that for several reasons, one being that I have to concentrate on Blackmire, one being that I'm busy doing soo many other things DA and last but not least I fear the G man would do an unpleasant grafting with me.
For Blackmire I've planned working with plaster a lot and even doing some vehicle (working this time, not wrecked). And I promise to do a complete "How to" article for this terrain project as well.
The fact that it was already divulged that the vehicles run on Methane, I don't want to think about a "working" DA vehicle. Much less a "How to" make one
![]()
lol
Well, I meant "working" in the sense of not being a wreck.
Besides, I can't transfer the smell via forum, can I ?![]()
fart in a plastic bag, zip it shut and send it in the mail.. best way to see if methane travels well...
http://www.amera.co.uk/gallery.php
seems like I made it into their gallery![]()